Proposed Two (2) Storey Residential Building
Electrical Works
Proposed Two (2) Storey Residential Building
Plastering / Floor Tiles
TRI PHASIC MARKETING & ENGINEERING SERVICES
February 13 - June 5, 2019
Engr. Lemual T. Ladero
General Manager
Schneider Electric CAV 3 Office
Electrical Fit-out
Schneider Electric PDC Office
Electrical Fit-out
2G KONSTRAKT INC.
March 2019 - May 2019
Engr. Fernando S. Alinea
President / CEO
Various Projects Electrical Installation and Repair
Electrical Works
MAGNA BUSINESS SOLUTION COMMERCIAL CORPORATION
August 2019 - February 2020
Ms. Jimmy and Hazel Alvivar
Proprietor / Owner
Supply and Installation of Power Lighting and Main Distribution of IT Alley, located at 2nd flr., Ayala, Marikina Mall
Electrical Works
Supply and Installation of Power Supply including lighting system of 8 units Merchants, located at 2nd flr., Market Market Mall, Taguig City
Electrical Works
NORTHERN PHILIPPINES ANNUAL CONFERENCE INC OF THE UNITED METHODIST CHURCH
August 2019 - November 2019
Ms. Dulcineah Lyra F. Dela Cruz
President
Supply and Installation of Electrical System for 6 Storey John Wesley College Dormitory at Tuguegarao City
Electrical Works
TOUCAN CORPORATION
January 2020 - March 2020
Engr. Jayson Toucan
Facilities Engineer
Conduct Engineering Expertise for Power System Study and Thermographic Scanning of Electrical System o 8 storey
Global Commercial Building at Salcedo Village, Makati
Electrical and Power System Analysis
TRIAX COMMERCIAL BUILDING
February 2020 - June 2020
Dr. Xerez and Dra. Che
Rehabilitation of Electrical Distribution System including Rewiring of Metering Center of 4 Storey Triax II Commercial
Building at Buting, Pasig City
Electrical Works
RUSTAN COFFEE (STARBUCKS)
January 2020
Engr. Hope Salome / Hazylyn Bautista
Conduct Power System Study of Starbucks High Pointe Medical Hub at Brgy. Bagong Silang, Mandaluyong City
Power System Analysis
PHILIPPINE NATIONAL BANK
June 2019 - April 2020
Main Office: Diosdado Macapagal Blvd, Pasay City
Engr. Jayson J. Sortijas
Senior Maintenance
Various PNB Metro Manila and Metro Provincial Branches
Servicing and Installation Electrical and Structured Cabling Works
Various PNB Metro Manila Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data
Communication Systems
Various PNB Northern Luzon Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data
Communication Systems
Various PNB Northern Panay Area Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data
Communication Systems, including Power Supply for Cash Assistance Machine (CAM)
COPPIER TECHNOLOGY AND ADVISORY CORPORATION
June - August 2020
Engr. Rehnie D. Sicat
Managing Director and CEO
Construction and Erection of ZTE Cell site at Pagbilao, Quezon Province
ZTE Cell site Construction and Erection
JRB CONSTRUCTION AND DEVELOPMENT CORPORATION
December 2020 - January 2021
Engr. Jay R. Borre
President / CEO
Proposed Interior Renovation of DTEQ Office at Unit 1402 & 1403
Prime Building MBP Ayala Alabang, Muntinlupa City
Structured Cabling (Voice and Data Communication System)
FLEXO MANUFACTURING INC.
February - March 2021
Engr. Bobby Tan
Production and Operation Manager
Preventive Maintenance of Electrical Equipment including the issuance of
Compliance Certificate for Electrical, Mechanical, and Structural Analysis for
Flexo Manufacturing Plant
Electrical, Mechanical, Structural Integrity Test
YIKING PLASTIC MANUFACTURING
April 6-8 2021
Mr. Donfu Liu
Project Manager
Installation and Termination of twelve (12) Sets XLPE 3M Termination kit
for 34.5 kV High Voltage Distribution System Entrance Post to Power House
of the Plastic Manufacturing
Electrical High Voltage Distribution System
COMBINED ELECTRO-MECHANICAL SUPPLY INC.
February 20 - July 2021
Engr. Mary Grace Paguntalan
Operation Sales Manager
Power System Analysis including Testing and Commissioning of newly Installed Brand New 6300 Amperes Rating Low Voltage Switch Gear provision for Tower 1 and Tower 2 of RCBC Plaza
Electrical Testing and Power System Study
ARCTIC ZONE INC
March 2021 - May 2021
Engr. Angelo Roa
President / CEO
Annual Preventive Maintenance of Five (5) Far Eastern University
Nicanor Reyes Medical Foundation Building
Electrical PMS Works and Correction
1. FEU Hospital Building
2. Intern Medicine Building
3. Tower Building
4. JCR Building
5. Arcad Building
PHILIPPINE NATIONAL BANK
June 2019 - April 2020
Main Office: Diosdado Macapagal Blvd, Pasay City
Engr. Jayson J. Sortijas
Senior Maintenance
Various PNB Metro Manila and Metro Provincial Branches
Servicing and Installation Electrical and Structured Cabling Works
Various PNB Metro Manila Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data
Communication Systems
Various PNB Northern Luzon Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data
Communication Systems
Various PNB Northern Panay Area Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data
Communication Systems, including Power Supply for Cash Assistance Machine (CAM)
PHILIPPINE NATIONAL BANK
June 2019 - April 2020
Main Office: Diosdado Macapagal Blvd, Pasay City
Engr. Jayson J. Sortijas
Senior Maintenance
Various PNB Metro Manila and Metro Provincial Branches
Servicing and Installation Electrical and Structured Cabling Works
Various PNB Metro Manila Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data
Communication Systems
Various PNB Northern Luzon Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data
Communication Systems
Various PNB Northern Panay Area Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data
Communication Systems, including Power Supply for Cash Assistance Machine (CAM)
FLEXO MANUFACTURING INC.
February - March 2021
Engr. Bobby Tan
Production and Operation Manager
Preventive Maintenance of Electrical Equipment including the issuance of
Compliance Certificate for Electrical, Mechanical, and Structural Analysis for
Flexo Manufacturing Plant
Electrical, Mechanical, Structural Integrity Test
FLEXO MANUFACTURING INC.
February - March 2021
Engr. Bobby Tan
Production and Operation Manager
Preventive Maintenance of Electrical Equipment including the issuance of
Compliance Certificate for Electrical, Mechanical, and Structural Analysis for
Flexo Manufacturing Plant
Electrical, Mechanical, Structural Integrity Test
ARCTIC ZONE INC.
March 2021 - May 2021
Engr. Angelo Roa
President / CEO
Annual Preventive Maintenance of Five (5) Far Eastern University
Nicanor Reyes Medical Foundation Building
Electrical PMS Works and Correction
1. FEU Hospital Building
2. Intern Medicine Building
3. Tower Building
4. JCR Building
5. Arcad Building
ARCTIC ZONE INC.
March 2021 - May 2021
Engr. Angelo Roa
President / CEO
Annual Preventive Maintenance of Five (5) Far Eastern University
Nicanor Reyes Medical Foundation Building
Electrical PMS Works and Correction
1. FEU Hospital Building
2. Intern Medicine Building
3. Tower Building
4. JCR Building
5. Arcad Building
Get in Touch, Stay in Touch: We're Just a Message Away
• UP TECH BUILDERS
• TRI PHASIC MARKETING & ENGINEERING SERVICES
• 2G KONSTRAKT INC.
• MAGNA BUSINESS SOLUTION COMMERCIAL CORP.
• NORTHERN PHILIPPINES ANNUAL CONFERENCE INC. OF THE UNITED METHODIST CHURCH
• R+A OLAES CONSULTING ENGINEERING
• TOUCAN CORPORATION
• TRIAX COMMERCIAL BUILDING
• RUSTAN COFFEE (STARBUCKS)
• PHILIPPINE NATIONAL BANK
• COPPIER TECHNOLOGY AND ADVISORY CORPORATION
• LA CABALQUINTO ELECTRICAL SERVICES
• JRB CONSTRUCTION AND DEVELOPMENT CORPORATION
• FLEXO MANUFACTURING INC.
• YIKING PLASTIC MANUFACTURING
• COMBINED ELECTRO MECHANICAL SUPPLY INC.
• ARCTIC ZONE INC