RECENT PROJECTS

List of Completed and On-going Projects

UPTECH BUILDERS

April 2019 - March 2020

Engr. Carlo G. Romero
Project Manager

Proposed Two (2) Storey Residential Building
Electrical Works

Proposed Two (2) Storey Residential Building
Plastering / Floor Tiles

TRI PHASIC MARKETING & ENGINEERING SERVICES

February 13 - June 5, 2019

Engr. Lemual T. Ladero
General Manager

Schneider Electric CAV 3 Office
Electrical Fit-out

Schneider Electric PDC Office
Electrical Fit-out

2G KONSTRAKT INC.

March 2019 - May 2019

Engr. Fernando S. Alinea
President / CEO

Various Projects Electrical Installation and Repair
Electrical Works

MAGNA BUSINESS SOLUTION COMMERCIAL CORPORATION

August 2019 - February 2020

Ms. Jimmy and Hazel Alvivar
Proprietor / Owner

Supply and Installation of Power Lighting and Main Distribution of IT Alley, located at 2nd flr.,
Ayala, Marikina Mall
Electrical Works

Supply and Installation of Power Supply including lighting system of 8 units Merchants, located at 2nd flr.,
Market Market Mall, Taguig City
Electrical Works

NORTHERN PHILIPPINES ANNUAL CONFERENCE INC OF THE UNITED METHODIST CHURCH

August 2019 - November 2019

Ms. Dulcineah Lyra F. Dela Cruz
President

Supply and Installation of Electrical System for 6 Storey John Wesley College Dormitory at Tuguegarao City
Electrical Works

TOUCAN CORPORATION

January 2020 - March 2020

Engr. Jayson Toucan
Facilities Engineer

Conduct Engineering Expertise for Power System Study and Thermographic Scanning of Electrical System o 8 storey Global Commercial Building at Salcedo Village, Makati
Electrical and Power System Analysis

TRIAX COMMERCIAL BUILDING

February 2020 - June 2020

Dr. Xerez and Dra. Che

Rehabilitation of Electrical Distribution System including Rewiring of Metering Center of 4 Storey Triax II Commercial Building at Buting, Pasig City
Electrical Works

RUSTAN COFFEE (STARBUCKS)

January 2020

Engr. Hope Salome / Hazylyn Bautista

Conduct Power System Study of Starbucks High Pointe Medical Hub at Brgy. Bagong Silang, Mandaluyong City Power System Analysis

PHILIPPINE NATIONAL BANK

June 2019 - April 2020

Main Office: Diosdado Macapagal Blvd, Pasay City
Engr. Jayson J. Sortijas
Senior Maintenance

Various PNB Metro Manila and Metro Provincial Branches
Servicing and Installation Electrical and Structured Cabling Works
Various PNB Metro Manila Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data Communication Systems

Various PNB Northern Luzon Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data Communication Systems

Various PNB Northern Panay Area Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data
Communication Systems, including Power Supply for Cash Assistance Machine (CAM)

COPPIER TECHNOLOGY AND ADVISORY CORPORATION

June - August 2020

Engr. Rehnie D. Sicat
Managing Director and CEO

Construction and Erection of ZTE Cell site at Pagbilao, Quezon Province
ZTE Cell site Construction and Erection

JRB CONSTRUCTION AND DEVELOPMENT CORPORATION

December 2020 - January 2021

Engr. Jay R. Borre
President / CEO

Proposed Interior Renovation of DTEQ Office at Unit 1402 & 1403
Prime Building MBP Ayala Alabang, Muntinlupa City
Structured Cabling (Voice and Data Communication System)

FLEXO MANUFACTURING INC.

February - March 2021

Engr. Bobby Tan
Production and Operation Manager

Preventive Maintenance of Electrical Equipment including the issuance of Compliance Certificate for Electrical, Mechanical, and Structural Analysis for Flexo Manufacturing Plant
Electrical, Mechanical, Structural Integrity Test

YIKING PLASTIC MANUFACTURING

April 6-8 2021

Mr. Donfu Liu
Project Manager

Installation and Termination of twelve (12) Sets XLPE 3M Termination kit for 34.5 kV High Voltage Distribution System Entrance Post to Power House of the Plastic Manufacturing
Electrical High Voltage Distribution System

COMBINED ELECTRO-MECHANICAL SUPPLY INC.

February 20 - July 2021

Engr. Mary Grace Paguntalan
Operation Sales Manager

Power System Analysis including Testing and Commissioning of newly Installed Brand New 6300 Amperes Rating Low Voltage Switch Gear provision for Tower 1 and Tower 2 of RCBC Plaza
Electrical Testing and Power System Study

ARCTIC ZONE INC

March 2021 - May 2021

Engr. Angelo Roa President / CEO

Annual Preventive Maintenance of Five (5) Far Eastern University
Nicanor Reyes Medical Foundation Building
Electrical PMS Works and Correction
1. FEU Hospital Building
2. Intern Medicine Building
3. Tower Building
4. JCR Building
5. Arcad Building

PHILIPPINE NATIONAL BANK

June 2019 - April 2020

Main Office: Diosdado Macapagal Blvd, Pasay City
Engr. Jayson J. Sortijas
Senior Maintenance

Various PNB Metro Manila and Metro Provincial Branches
Servicing and Installation Electrical and Structured Cabling Works
Various PNB Metro Manila Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data Communication Systems

Various PNB Northern Luzon Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data Communication Systems

Various PNB Northern Panay Area Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data
Communication Systems, including Power Supply for Cash Assistance Machine (CAM)

PHILIPPINE NATIONAL BANK

June 2019 - April 2020

Main Office: Diosdado Macapagal Blvd, Pasay City
Engr. Jayson J. Sortijas
Senior Maintenance

Various PNB Metro Manila and Metro Provincial Branches
Servicing and Installation Electrical and Structured Cabling Works
Various PNB Metro Manila Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data Communication Systems

Various PNB Northern Luzon Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data Communication Systems

Various PNB Northern Panay Area Branches
Installation of Fiber Optic Cable Conduit provision for Backbone Data
Communication Systems, including Power Supply for Cash Assistance Machine (CAM)

FLEXO MANUFACTURING INC.

February - March 2021

Engr. Bobby Tan
Production and Operation Manager

Preventive Maintenance of Electrical Equipment including the issuance of Compliance Certificate for Electrical, Mechanical, and Structural Analysis for Flexo Manufacturing Plant
Electrical, Mechanical, Structural Integrity Test

FLEXO MANUFACTURING INC.

February - March 2021

Engr. Bobby Tan
Production and Operation Manager

Preventive Maintenance of Electrical Equipment including the issuance of Compliance Certificate for Electrical, Mechanical, and Structural Analysis for Flexo Manufacturing Plant
Electrical, Mechanical, Structural Integrity Test

ARCTIC ZONE INC.

March 2021 - May 2021

Engr. Angelo Roa President / CEO

Annual Preventive Maintenance of Five (5) Far Eastern University
Nicanor Reyes Medical Foundation Building
Electrical PMS Works and Correction
1. FEU Hospital Building
2. Intern Medicine Building
3. Tower Building
4. JCR Building
5. Arcad Building

ARCTIC ZONE INC.

March 2021 - May 2021

Engr. Angelo Roa President / CEO

Annual Preventive Maintenance of Five (5) Far Eastern University
Nicanor Reyes Medical Foundation Building
Electrical PMS Works and Correction
1. FEU Hospital Building
2. Intern Medicine Building
3. Tower Building
4. JCR Building
5. Arcad Building

Get in Touch, Stay in Touch: We're Just a Message Away

OUR CLIENTS

Lists of Satisfied Clients

• UP TECH BUILDERS
• TRI PHASIC MARKETING & ENGINEERING SERVICES
• 2G KONSTRAKT INC.
• MAGNA BUSINESS SOLUTION COMMERCIAL CORP.
• NORTHERN PHILIPPINES ANNUAL CONFERENCE INC. OF THE UNITED METHODIST CHURCH
• R+A OLAES CONSULTING ENGINEERING

• TOUCAN CORPORATION
• TRIAX COMMERCIAL BUILDING
• RUSTAN COFFEE (STARBUCKS)
• PHILIPPINE NATIONAL BANK
• COPPIER TECHNOLOGY AND ADVISORY CORPORATION
• LA CABALQUINTO ELECTRICAL SERVICES

• JRB CONSTRUCTION AND DEVELOPMENT CORPORATION
• FLEXO MANUFACTURING INC.
• YIKING PLASTIC MANUFACTURING
• COMBINED ELECTRO MECHANICAL SUPPLY INC.
• ARCTIC ZONE INC